01 / XLDS↗Packaged sewage treatment
For decentralized domestic sewage from communities, schools and living quarters.
Explore equipment →WASTEWATER EQUIPMENT / PROJECT SUPPORT
Wastewater treatment equipment for EPC contractors, local integrators and project teams. From packaged systems to flotation and sedimentation units.
ACTUAL EQUIPMENT / XLWW SERIES01 / EQUIPMENT PORTFOLIO
Choose a starting point, then review the wastewater, treatment target and scope with the project team.
01 / XLDS↗For decentralized domestic sewage from communities, schools and living quarters.
Explore equipment →
02 / XLWW↗Project-specific treatment equipment following review of the production stream.
Explore equipment →
03 / XLDA↗A defined separation stage for suspended solids, oil and flocs.
Explore equipment →
04 / XLSR↗Settling and clarification equipment with project-specific sludge interfaces.
Explore equipment →02 / APPLICATIONS
Different streams call for different design inputs. Explore the application before selecting the equipment.

Confirm average and peak flow, water analysis, treatment target, site conditions and operating responsibility.
Explore domestic sewage equipment ↗
Review process chemicals, stream segregation, representative analysis and variability before defining a candidate treatment route.
Explore the industrial application ↗
Discuss solids, oil and floc characteristics, conditioning needs, upstream / downstream interfaces and sludge handling.
Explore separation applications ↗
ACTUAL WORKSHOP PHOTOGRAPHY03 / ABOUT XIANG LV HUANBAO
Established in 2014, Guangzhou Xiang Lv Environmental Protection Equipment Co.,ltd. supplies packaged sewage systems, industrial wastewater equipment, and flotation and sedimentation units.
We review process configuration, materials and controls against the influent, treatment target and agreed scope. Inspection, English documents and installation support can be arranged for the project.
*Material suitability and actual series construction are confirmed per project. Service scope, scheduling and costs are agreed individually.
Explore manufacturing & delivery ↗04 / ENGINEERING & SUPPORT
Wastewater source, flow, analysis, operating conditions and target.
Process, materials, controls, interfaces and technical documents.
Inspection method, test scope, records, packing and shipping preparation.
Local works, installation arrangements, commissioning support and training.
05 / SELECTED PROJECT REFERENCES
A recorded equipment-supply reference for a defined wastewater duty.
Anonymous project reference ↗A recorded route including advanced pretreatment and biological stages.
Anonymous project reference ↗A registered sewage project, separate from the current XLDS model directory.
Anonymous project reference ↗Recorded flows are project design duties. Contract treatment targets are not measured operating results. Each new project requires its own influent review and acceptance conditions.
06 / TECHNICAL RESOURCES
Practical guides and typical process diagrams to help prepare the equipment discussion.
LET’S DEFINE YOUR PROJECT
Start with the wastewater source, average and peak flow, treatment target and site location.