Phosphate-containing wastewater

A recorded equipment-supply project with DAF and two-stage sedimentation.

Equipment supplyRecorded project-specific route
RECORDED DESIGN FLOW10m³/d

Design duty, not measured operating throughput

RECORDED PROCESS STAGES

A route defined for this project.

01Dissolved air flotation02First sedimentation stage03Second sedimentation stage

Text schematic of registered stages. It is not a complete project PFD, a fixed equipment specification or an as-built drawing.

01 / WASTEWATER & PROJECT CONTEXT

Start with the duty.

The project register identifies phosphate-containing wastewater and records oil, zinc and iron among the pollutants, with poor biodegradability noted. The source production process is not specified in the public summary.

What the public record supports

The public record identifies equipment supply. DAF and two-stage sedimentation are recorded; the available public summary does not establish a complete upstream or downstream process, civil works or overseas installation scope.

02 / DESIGN INFORMATION

Separate the inlet
from the target.

Company water-quality register, dated 2026-10-30. Values below are registered design information, not a before-and-after test.

REGISTERED INLET / DESIGN BASIS
Registered inlet values
ParameterRecorded value
pH5–7
COD50 mg/L
Suspended solids100 mg/L
Total phosphorus105 mg/L
CONTRACT DESIGN TARGETS / NOT MEASURED
Registered contractual outlet limits
ParameterRecorded value
pH6.5–9.5
COD≤ 500 mg/L
Suspended solids≤ 400 mg/L
Total phosphorus≤ 8 mg/L

The registered influent COD is 50 mg/L while the contract design limit is 500 mg/L. They are different design records and are not presented as a measured before-and-after comparison.

03 / PERFORMANCE EVIDENCE

Design limits
are not test results.

The public reference does not include a measured outlet dataset or independently verified removal rate. No operating acceptance status is claimed on this page.

For a new project, influent conditions, discharge or reuse limits, sampling methods and acceptance criteria must be agreed separately.

04 / CONTINUE THE EQUIPMENT DISCUSSION

Explore related equipment.

Related equipment describes a discussion entry, not confirmation of the exact model installed in this project.