WASTEWATER TREATMENT EQUIPMENT · EST. 2014+86 136 1005 7417

SOLID–LIQUID SEPARATION / XLSR

Sedimentation Tank — Tube Settler Type

A tube-settler arrangement for solid–liquid separation, with inlet distribution, sludge settling and clarified-water collection.

Inclined tube settler, 45-degree viewEquipment reference · Final specification by project

01 / TECHNICAL DATA

XLSR model reference.

Source data: 2026-11-02
XLSR series reference specifications
ModelL × W × H (mm)Installed power (kW)Empty weight (t)Operating weight (t)
XLSR-104000 × 2200 × 240022.218
XLSR-206000×2200×24003.52.826
XLSR-307800×2200×250053.536

Reference data for project discussion. Final dimensions, power, weights and design duty are confirmed in the project technical proposal. Installed power is not a statement of operating energy consumption.

Design flow is confirmed for the project. Please share your required average and peak flow, with the units and daily operating hours.

02 / TREATMENT ROUTE

A typical configuration.

Open process diagram (PDF) ↗
  1. 01Inlet distribution & flow stabilization
  2. 02Tube-settler separation
  3. 03Sludge settling & thickening
  4. 04Clarified-water collection
  5. 05Sludge discharge

This is a separation stage, not a universal complete treatment system. Actual influent and separation targets must be reviewed for the project. Actual process configuration, unit selection and equipment specifications are confirmed for each project.

03 / DESIGN BASIS

Define the influent.
Agree the target.

This is a separation stage, not a universal complete treatment system. Actual influent and separation targets must be reviewed for the project.

Discharge or reuse limits, acceptance methods and operating conditions are reviewed and agreed for each project.

Design influent reference — applicability subject to review
ParameterReference influent envelope
CODcr≤ 500 mg/L
Suspended solids≤ 250 mg/L
Oil≤ 10 mg/L
Inclined tube settler, inclined tube media

04 / CONFIGURATION & DELIVERY

Materials, scope
and site interfaces.

Materials
Coated carbon steel or stainless steel, selected per project.
Listed equipment scope
Steel tank, tube-settler media and support frame. Sludge withdrawal and dosing interfaces are agreed per project.
Controls
PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English HMI are options.
Installation
Above-ground installation. Foundation loads, maintenance access and sludge handling are confirmed for the site.
Shipping
XLSR-10 and XLSR-20 are listed for complete-unit shipment; XLSR-30 for shipment in sections. Packing, lifting and freight arrangements are confirmed against final shipping dimensions and destination.

05 / QUESTIONS

Before you specify.

How is the equipment selected for my project?

Send the wastewater source, average and peak flow, water analysis and treatment target. The process and equipment scope are confirmed after review of these conditions.

What determines the sedimentation tank configuration?

Inlet conditions, solids characteristics, separation target, available space and sludge handling requirements must be reviewed. Dimensions alone do not establish separation performance.

Can I specify component brands?

Component brands are selected for each project. Client-specified brands can be accommodated on request, with final makes and models confirmed in the technical proposal.

Which control options are available?

PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English operator interface are available as options.

Can you provide English documents and project support?

English operating manuals, electrical drawings and process flow diagrams can be provided. Remote installation guidance, on-site installation and commissioning, and operator training can be arranged. Scope and fees are agreed per project.

Final process selection, equipment specifications and performance commitments are subject to the confirmed influent conditions, treatment targets and agreed scope of supply.

START WITH YOUR PROJECT

Tell us about the water.
We’ll discuss the equipment.

Prepare your enquiry