SOLID–LIQUID SEPARATION / XLSR
Sedimentation Tank — Tube Settler Type
A tube-settler arrangement for solid–liquid separation, with inlet distribution, sludge settling and clarified-water collection.
Equipment reference · Final specification by project01 / TECHNICAL DATA
XLSR model reference.
| Model | L × W × H (mm) | Installed power (kW) | Empty weight (t) | Operating weight (t) |
|---|---|---|---|---|
| XLSR-10 | 4000 × 2200 × 2400 | 2 | 2.2 | 18 |
| XLSR-20 | 6000×2200×2400 | 3.5 | 2.8 | 26 |
| XLSR-30 | 7800×2200×2500 | 5 | 3.5 | 36 |
Reference data for project discussion. Final dimensions, power, weights and design duty are confirmed in the project technical proposal. Installed power is not a statement of operating energy consumption.
Design flow is confirmed for the project. Please share your required average and peak flow, with the units and daily operating hours.
02 / TREATMENT ROUTE
A typical configuration.
- 01Inlet distribution & flow stabilization
- 02Tube-settler separation
- 03Sludge settling & thickening
- 04Clarified-water collection
- 05Sludge discharge
This is a separation stage, not a universal complete treatment system. Actual influent and separation targets must be reviewed for the project. Actual process configuration, unit selection and equipment specifications are confirmed for each project.
03 / DESIGN BASIS
Define the influent.
Agree the target.
This is a separation stage, not a universal complete treatment system. Actual influent and separation targets must be reviewed for the project.
Discharge or reuse limits, acceptance methods and operating conditions are reviewed and agreed for each project.
| Parameter | Reference influent envelope |
|---|---|
| CODcr | ≤ 500 mg/L |
| Suspended solids | ≤ 250 mg/L |
| Oil | ≤ 10 mg/L |

04 / CONFIGURATION & DELIVERY
Materials, scope
and site interfaces.
- Materials
- Coated carbon steel or stainless steel, selected per project.
- Listed equipment scope
- Steel tank, tube-settler media and support frame. Sludge withdrawal and dosing interfaces are agreed per project.
- Controls
- PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English HMI are options.
- Installation
- Above-ground installation. Foundation loads, maintenance access and sludge handling are confirmed for the site.
- Shipping
- XLSR-10 and XLSR-20 are listed for complete-unit shipment; XLSR-30 for shipment in sections. Packing, lifting and freight arrangements are confirmed against final shipping dimensions and destination.
05 / QUESTIONS
Before you specify.
How is the equipment selected for my project?
Send the wastewater source, average and peak flow, water analysis and treatment target. The process and equipment scope are confirmed after review of these conditions.
What determines the sedimentation tank configuration?
Inlet conditions, solids characteristics, separation target, available space and sludge handling requirements must be reviewed. Dimensions alone do not establish separation performance.
Can I specify component brands?
Component brands are selected for each project. Client-specified brands can be accommodated on request, with final makes and models confirmed in the technical proposal.
Which control options are available?
PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English operator interface are available as options.
Can you provide English documents and project support?
English operating manuals, electrical drawings and process flow diagrams can be provided. Remote installation guidance, on-site installation and commissioning, and operator training can be arranged. Scope and fees are agreed per project.
Final process selection, equipment specifications and performance commitments are subject to the confirmed influent conditions, treatment targets and agreed scope of supply.