INDUSTRIAL WASTEWATER / XLWW
Integrated Industrial Wastewater Treatment System
Integrated treatment equipment selected after review of your production process, wastewater analysis and discharge requirements.
Equipment reference · Final specification by project01 / TECHNICAL DATA
XLWW model reference.
| Model | Design flow (m³/d) | L × W × H (mm) | Installed power (kW) | Empty weight (t) | Operating weight (t) |
|---|---|---|---|---|---|
| XLWW-10 | 10 | 4500 × 2000 × 2400 | 5.5 | 2.8 | 13 |
| XLWW-20 | 20 | 6000 × 2200 × 2400 | 8.5 | 4 | 24 |
| XLWW-30 | 30 | 8500 × 2400 × 2500 | 12 | 5.8 | 44 |
Reference data for project discussion. Final dimensions, power, weights and design duty are confirmed in the project technical proposal. Installed power is not a statement of operating energy consumption.
02 / TREATMENT ROUTE
A typical configuration.
- 01Equalization
- 02Dissolved air flotation
- 03Coagulation & sedimentation
- 04A/O biological treatment
- 05Secondary sedimentation
- 06Filtration
This is an indicative treatment train, not a fixed process for all industrial wastewater. Composition, biodegradability and concentrated streams must be assessed. Actual process configuration, unit selection and equipment specifications are confirmed for each project.
03 / DESIGN BASIS
Define the influent.
Agree the target.
This is an indicative treatment train, not a fixed process for all industrial wastewater. Composition, biodegradability and concentrated streams must be assessed.
Discharge or reuse limits, acceptance methods and operating conditions are reviewed and agreed for each project.
| Parameter | Reference influent envelope |
|---|---|
| CODcr | ≤ 500 mg/L |
| BOD₅ | ≤ 150 mg/L; other duties require review |
| Suspended solids | ≤ 300 mg/L |
| Oil | ≤ 40 mg/L |
| LAS | ≤ 20 mg/L |
| Ammonia nitrogen | ≤ 15 mg/L, excluding concentrated waste liquid |
| Total nitrogen | ≤ 25 mg/L |
| pH | 6–9 |

04 / CONFIGURATION & DELIVERY
Materials, scope
and site interfaces.
- Materials
- Coated carbon steel or stainless steel, selected for the wastewater and project requirements.
- Listed equipment scope
- Main treatment unit, blower, pumps, aeration and mixing equipment; final unit selection is project-specific.
- Controls
- PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English HMI are options.
- Installation
- Above-ground installation. Site works and equipment interconnections are defined in the project scope.
- Shipping
- XLWW-10 and XLWW-20 are listed for complete-unit shipment; XLWW-30 for shipment in sections. Packing, lifting and freight arrangements are confirmed against final shipping dimensions and destination.
05 / QUESTIONS
Before you specify.
How is the equipment selected for my project?
Send the wastewater source, average and peak flow, water analysis and treatment target. The process and equipment scope are confirmed after review of these conditions.
Can I specify component brands?
Component brands are selected for each project. Client-specified brands can be accommodated on request, with final makes and models confirmed in the technical proposal.
Which control options are available?
PLC and touchscreen control can be provided. Remote monitoring, mobile alerts and an English operator interface are available as options.
Can you provide English documents and project support?
English operating manuals, electrical drawings and process flow diagrams can be provided. Remote installation guidance, on-site installation and commissioning, and operator training can be arranged. Scope and fees are agreed per project.
Final process selection, equipment specifications and performance commitments are subject to the confirmed influent conditions, treatment targets and agreed scope of supply.