WASTEWATER EQUIPMENT / GUANGZHOU, CHINA+86 136 1005 7417 ↗
XL↗XIANG LVHUANBAO / ENVIRONMENTAL EQUIPMENT

APPLICATION 02 / INDUSTRIAL WASTEWATER

Start with the process.
Define the treatment.

Equipment and engineering support for industrial wastewater projects. Start with the production stream, water analysis and treatment target.

Prepare your project brief ↗
Xianglv integrated industrial wastewater equipment in the manufacturing workshopACTUAL EQUIPMENT PHOTOGRAPH / XLWW SERIES
APPLICATION-LED ENGINEERINGSTREAM → DESIGN BASIS → EQUIPMENT SCOPE
FOR EPCs & LOCAL INTEGRATORSNEW SYSTEMS / DEFINED EQUIPMENT-STAGE UPGRADESPROCESS SELECTION BY PROJECT ↗

01 / UNDERSTAND THE SOURCE

Different production streams.
Different design questions.

Explore application settings supported by our company materials. Each stream requires its own review before selecting equipment.

01

Metal & hardware cleaning

Identify the cleaning steps and chemicals used, distinguish concentrated waste from rinse streams, and provide a representative analysis.

Production stepsStream segregationWater analysis

02 / ENGINEERING QUESTIONS

Resolve the conditions
that shape the system.

We define the duty before committing to a process or equipment package.

01 / WATER

Composition & variation

Review chemicals, representative analysis, concentrated streams and daily changes. A COD figure alone is not a selection basis.

02 / TARGET

Discharge or reuse duty

Confirm the actual project limits, sampling points, operating conditions and acceptance methods.

03 / SITE

Interfaces & residuals

Define upstream and downstream connections, sludge or scum handling, available plot, utilities and local responsibilities.

03 / CANDIDATE TREATMENT STAGES

Build the route
around the actual duty.

Typical XLWW process PDF ↗

The company materials include the stages below. Their use, order and combination are reviewed for the wastewater; this page does not automatically select a process.

A / SEPARATION

Oil, suspended solids
& floc separation

Conditioning→DAF or sedimentation→Next treatment stage

Evaluate the separation duty, conditioning or test needs, and the scum / sludge interfaces. A separation unit is not a complete discharge-compliance system.

XLDA / XLSR ↗
B / INTEGRATED TREATMENT

Physical–chemical
& biological stages

Equalization→Pretreatment→A/O + clarification

The registered XLWW typical route includes equalization, DAF, coagulation / sedimentation, A/O biological treatment, sedimentation and filtration. Actual unit selection requires project assessment.

XLWW ↗
C / PROJECT-SPECIFIC REVIEW

Complex or concentrated
industrial streams

Separate assessment→Testing / process review→Defined treatment train

Concentrated waste and complex composition need separate assessment. Fenton and ozone are among the company’s process capabilities; neither is a universal configuration.

Discuss the duty ↗

Conceptual stage relationships only. Concentrated wastewater and the C03 pharmaceutical project must not be treated as routine XLWW influent. No removal rate or effluent guarantee is implied.

04 / CONNECT THE APPLICATION TO EQUIPMENT

A system or a treatment stage.
Define what you need.

Supply scope, material, controls and interfaces are confirmed in the project technical proposal.

XLWW integrated industrial wastewater equipment
XLWW / INTEGRATED SYSTEM

Industrial wastewater equipment

A project-specific equipment arrangement following review of the production stream and treatment target.

View typical process PDF ↗
Xianglv dissolved air flotation equipment
XLDA / SEPARATION UNIT

Dissolved air flotation

Discuss oil, suspended solids and floc separation within the agreed treatment train.

View typical process PDF ↗
Xianglv sedimentation tank equipment
XLSR / SEPARATION UNIT

Sedimentation tank

Define settling, clarification, loading and sludge withdrawal for the actual project duty.

View typical process PDF ↗

05 / PROJECT-SPECIFIC REFERENCES

Experience with a defined context.

Anonymous text references from the company register. Each describes its own duty and evidence limits.

C01 / PHOSPHATE-CONTAINING WASTEWATER10 m³/d

Separation stages for a recorded duty.

DAF and two-stage sedimentation are recorded for this project. The phosphorus target is a contract design requirement, not a measured operating result.

Anonymous equipment-supply reference
C03 / BIOPHARMACEUTICAL WASTEWATER20 m³/d

A project-specific treatment train.

The project record includes iron–carbon micro-electrolysis, Fenton oxidation, neutralization / sedimentation, UASB and biological treatment.

Project-specific route; not a standard XLWW configuration

Site photographs are omitted in accordance with current permissions. Design targets are not represented as measured performance or proof of acceptance.

WORKING WITH YOUR PROJECT TEAM

Agree the equipment.
Clarify the interfaces.

For EPC contractors, local integrators and industrial project teams, the discussion covers both the equipment package and the work needed around it.

Control panel detail from Xianglv equipment documentation
01

Equipment & engineering documents

Confirm the equipment list, process diagram, material, controls, electrical interfaces and English document scope.

02

Local site responsibilities

Agree foundations, external piping, power, lifting, residuals handling and local installation responsibilities.

03

Inspection & project support

On-site, video or third-party inspection can be arranged. Remote guidance, on-site support and training are scoped and costed per project.

06 / PREPARE YOUR PROJECT BRIEF

A useful first discussion
starts with a few clear facts.

Tick the information you already have. Download a checklist to prepare the remaining items. This tool does not submit an enquiry.

QUESTIONS BEFORE SELECTION

Define the duty
before the promise.

Can you select equipment from COD alone?

No. Wastewater source, composition, flow variation, treatment target and interfaces must be reviewed together. Representative analysis and any necessary tests support the selection.

Does every industrial application use the same process?

No. The XLWW diagram is a typical route. Unit selection and sequence depend on the actual wastewater and project conditions.

Can you supply a single treatment-stage package?

DAF or sedimentation units can be discussed as a defined equipment stage. Upstream conditioning, downstream requirements and scum / sludge interfaces must be clarified.

Does a case design target prove operating performance?

No. Contract design requirements and measured results are different evidence categories. Performance commitments and acceptance conditions are agreed for the individual project.

DISCUSS YOUR INDUSTRIAL WASTEWATER PROJECT

From the production stream
to a defined equipment scope.

Share the information available today. We can then review the duty, identify missing design inputs and discuss the appropriate next step.

Call +86 136 1005 7417 ↗