RESOURCES / DELIVERY PLANNING

Agree inspection and overseas delivery

A practical guide for defining the information and interfaces needed for an equipment discussion.

Use this guide to prepare a project discussion with XIANG LV HUANBAO. Final equipment selection and commitments require project-specific technical review.

01

Choose an inspection arrangement

Customer on-site inspection, video inspection and third-party inspection can be arranged. Agree the scope, timing, participants and records for the order.

02

Separate inspection from performance acceptance

Dimensions, materials, configuration and documents may form part of an agreed inspection. A performance test needs its own influent conditions, treatment targets, test method and operating basis.

03

Confirm the shipping configuration

Check the final packed dimensions, weights, lifting provisions and destination. The shipping method is confirmed for the model; do not infer container compatibility from a photograph.

04

Define the local work

Allocate foundations, utilities, unloading, lifting, mechanical and electrical connections, installation and site safety responsibilities.

05

Plan documents and training

English operating manuals, electrical drawings and process flow diagrams can be provided. Agree remote guidance, any on-site services, training and associated costs before delivery.

Source basis: company capability and project-enquiry records, KB-02. Updated: 2026-11-03.